Nyugawa power station Unit 1

  • Plant name:
    Nyugawa power station Unit 1
    Company / Operator:
    Sumitomo Joint Electric Power
    Owner company(ies) / Financier(s):
    ( no info. )
    Address:
    962-10 Hokujo, Saijo, Ehima
    Capacity (maximum power):
    250 [MW]
    Operation start date:
    Mar. 1975
    Fuel change date:
    Apr. 2003
    Note for fuel change:
    renovate for fuel change from oil to coal, currently mix with wood-biomass.
    Status:
    Operating
    Technology type:
    Sub-critical (Sub-C)
    Turbine steam pressure:
    16.6 [MPa]
    Turbine steam temperature:
    ( no info. )
    Thermal efficiency:
    ( no info. )
    Designed gross thermal efficiency:
    ( no info. )
    Designed net thermal efficiency:
    ( no info. )
    Note for thermal efficiency:
    ( no info. )
    Capacity factor:
    ( no info. )
    Note for technologies:
    ( no info. )
    Type of coal:
    ( no info. )
    CO2 emission:
    ( no info. )
    Source CO2 emission:
    ( no info. )
    CO2 emission factor:
    ( no info. )
    SOx emission concentration:
    ( no info. )
    NOx emission concentration:
    ( no info. )
    Ash dust emission concentration:
    ( no info. )
    Mercury emission concentration:
    ( no info. )
    Articles:
    ( no info. )