TEPCO,Chuden, Soma Kyodo Power / Shinchi town, Fukushima pref.

  • Plant name:
    Unknown
    Company / Operator:
    Soma Kyodo Power Company
    Owner company(ies) / Financier(s):
    TEPCO, Chubu Electric Power, Tohoku Electric Power
    Address:
    1-1 Imagami, Komagamne, Shinchi town, Soma district, Fukushima pref.
    Capacity (maximum power):
    1,000 [MW]
    Planning operation date:
    Unknown
    Actual operation date:
    ( no info. )
    Status:
    Planning (without official announcement)
    With or without EIA:
    Unknown
    EIA process:
    ( no info. )
    Note for EIA process:
    ( no info. )
    Technology type:
    Unknown
    Designed gross thermal efficiency:
    ( no info. )
    Designed net thermal efficiency:
    ( no info. )
    Note for technologies:
    ( no info. )
    Type of coal:
    ( no info. )
    CO2 emission:
    6.000 [Mt-CO2 / year]
    Source of CO2 emission:
    (estimated value from the power-generating capacity, based on the formula published by MIT, 2007.)
    CO2 emission factor:
    ( no info. )
    SOx emission concentration:
    ( no info. )
    NOx emission concentration:
    ( no info. )
    Ash dust emission concentration:
    ( no info. )
    Mercury emission concentration:
    ( no info. )
    Articles: