Kushiro Power Station / Hokkaido pref.

  • Plant name:
    Kushiro Power Station
    Company / Operator:
    Kushiro Thermal Power Plant Inc.
    Owner company(ies) / Financier(s):
    IDI Infrastructures
    Address:
    1-14, Okotsu, Kushiro city, Hokkaido pref.
    Capacity (maximum power):
    112 [MW]
    Planning operation date:
    2020 Nov.
    Actual operation date:
    ( no info. )
    Status:
    Trial operation
    With or without EIA:
    Local authority assessment
    EIA process:
    EIS is checked / Final EIS is made
    Note for EIA process:
    Technology type:
    Sub-critical (Sub-C)
    Designed gross thermal efficiency:
    ( no info. )
    Designed net thermal efficiency:
    ( no info. )
    Note for technologies:
    mixed with biomass of ca. 30% (in energy)
    Type of coal:
    ( no info. )
    CO2 emission:
    0.512 [Mt-CO2 / year]
    Source of CO2 emission:
    (estimated value from the power-generating capacity, based on the formula published by MIT, 2007.)
    CO2 emission factor:
    590.0 [g-CO2 / kWh]
    SOx emission concentration:
    100.0 [ppm]
    NOx emission concentration:
    100.0 [ppm]
    Ash dust emission concentration:
    30.0 [mg / m3]
    Mercury emission concentration:
    ( no info. )
    Articles:

    Kushiro plant started trial operation on June 19. Local paper mentioned but no official announcemet.

    Nikkei News informed operation schedule change (https://www.nikkei.com/article/DGXMZO39399230W8A221C1L41000/)

    The news were on several newspapers.
    http://www.k-coal.co.jp/information/data/5_2.pdf"