Maizuru power station Unit 1

  • Plant name:
    Maizuru power station Unit 1
    Company / Operator:
    Kansai Electric Power
    Owner company(ies) / Financier(s):
    ( no info. )
    Address:
    560-5 Chitose, Maizuru, Kyoto
    Capacity (maximum power):
    900 [MW]
    Operation start date:
    Aug. 2004
    Fuel change date:
    Aug. 2008
    Note for fuel change:
    biomass mixed combustion
    Status:
    Operating
    Technology type:
    Ultra-supercritical (USC)
    Turbine steam pressure:
    24.5 [MPa]
    Turbine steam temperature:
    main 595 [°C]/sub 595 [°C]
    Thermal efficiency:
    ( no info. )
    Designed gross thermal efficiency:
    43.0 [%]
    Designed net thermal efficiency:
    ( no info. )
    Note for thermal efficiency:
    ( no info. )
    Capacity factor:
    ( no info. )
    Note for technologies:
    ( no info. )
    Type of coal:
    ( no info. )
    CO2 emission:
    ( no info. )
    Source CO2 emission:
    ( no info. )
    CO2 emission factor:
    ( no info. )
    SOx emission concentration:
    ( no info. )
    NOx emission concentration:
    ( no info. )
    Ash dust emission concentration:
    ( no info. )
    Mercury emission concentration:
    ( no info. )
    Articles:
    ( no info. )