Hitachinaka Kyodo No.1 / Hitachinaka Generation / Tokai village, Ibaraki pref.

  • Plant name:
    Hitachinaka Kyodo No.1
    Company / Operator:
    Hitachinaka Generation
    Owner company(ies) / Financier(s):
    JERA Power Investment GK.
    Address:
    768-23 Terunuma, Tokai village, Naka district, Ibaraki pref.
    Capacity (maximum power):
    650 [MW]
    Planning operation date:
    FY2020
    Actual operation date:
    ( no info. )
    Status:
    Trial operation
    With or without EIA:
    Governmental assessment
    EIA process:
    EIS is checked / Final EIS is made
    Note for EIA process:

    Sending note of Screening 1 for Hitachinaka Kyodo Power Plant projecst at 2014/4/23
    Registration of Screening 2 for Hitachinaka Kyodo Power Plant project at 2014/10/1

    Registration of Draft EIS for Hitachinaka Kyodo Power Plant project at 2015/10/28
    Link to (in Japanese) http://hitagene.co.jp/
    Draft document of Screening 2 for Hitachinaka Kyodo Power project in an advisory meeting, 2015/2/27
    Link to (in Japanese) http://www.meti.go.jp/committee/kenkyukai/safety_security/kankyo_karyoku...

    Technology type:
    Ultra-supercritical (USC)
    Designed gross thermal efficiency:
    43.0 [%]
    Designed net thermal efficiency:
    ( no info. )
    Note for technologies:
    ( no info. )
    Type of coal:
    ( no info. )
    CO2 emission:
    3.680 [Mt-CO2 / year]
    Source of CO2 emission:
    (estimated value from the power-generating capacity, based on the formula published by MIT, 2007.)
    CO2 emission factor:
    760.0 [g-CO2 / kWh]
    SOx emission concentration:
    22.0 [ppm]
    NOx emission concentration:
    15.0 [ppm]
    Ash dust emission concentration:
    5.0 [mg / m3]
    Mercury emission concentration:
    ( no info. )