Hibikinada thermal power plant

  • Plant name:
    Hibikinada thermal power plant
    Company / Operator:
    Hibikinada thermal power plant
    Owner company(ies) / Financier(s):
    IDI-I
    Address:
    1 Hibikimachi, Wakamatsu ward, Kitakyushu city, Fukuoka pref.
    Capacity (maximum power):
    112 [MW]
    Planning operation date:
    2018/02
    Actual operation date:
    February 2019
    Status:
    Operation
    With or without EIA:
    Local authority assessment
    EIA process:
    EIS is checked / Final EIS is made
    Note for EIA process:

    local EIA
    operation may start 2 years from construction begin
    Draft EIS was submitted at November 2015 (link, Japanese) http://www.city.kitakyushu.lg.jp/kankyou/00600171.html
    EIS documentation was anounced during 2016/3/18 - 4/18 (link, Japanese) http://www.city.kitakyushu.lg.jp/kankyou/00600188.html

    Technology type:
    Unknown
    Designed gross thermal efficiency:
    ( no info. )
    Designed net thermal efficiency:
    ( no info. )
    Note for technologies:
    mixed with biomass (up to 30% in energy)
    Type of coal:
    ( no info. )
    CO2 emission:
    0.584 [Mt-CO2 / year]
    Source of CO2 emission:
    written in Screening document (Hibikinada Thermal Plant)
    CO2 emission factor:
    600.0 [g-CO2 / kWh]
    SOx emission concentration:
    19.0 [ppm]
    NOx emission concentration:
    40.0 [ppm]
    Ash dust emission concentration:
    10.0 [mg / m3]
    Mercury emission concentration:
    ( no info. )
    Articles: