Don’t go back to the 石炭〜石炭火力発電に反対 |石炭発電|石炭火力発電|反原発

【Update】Japan Coal Plant Tracker: 20170601

This is update on June 1st.

<EIA>

◆  Misumi No.2 Draft EIS is processing. (Document link in Japanese)
Draft EIS is available: 2017/5/26-2017/7/10
Openion due date is: 2017/7/10